|
 |
NSnet Peer Review of Hitachi Administrative Division, Hitachi, Ltd., conducted over a three-day period starting July 24th, was completed. A summary of the review is shown below.
1. Reviewed Establishment (location)
Hitachi Administrative Division (Nuclear System Division), Hitachi, Ltd., located in Hitachi-shi, Ibaraki Prefecture |
|
2. Overview of the establishment and targets of review
At the nuclear business of Hitachi, Ltd., since the start of development of nuclear power in 1954, a number of boiling water reactors (BWR) and advanced BWR (ABWR) have been developed, designed, manufactured, inspected, and installed. Operational support and after-service have also been provided. Technological development and system design and manufacturing have also been undertaken regarding new types of reactors and the nuclear fuel cycle. In this company, the Nuclear System Division is the center of these activities and works in cooperation with other divisions. The review was conducted on the activities carried out by the Nuclear System Division in the Hitachi Administrative Division to promote safety. In terms of manufacturing, the "Rinkai Factory," which is a main factory for manufacturing nuclear equipment, was also reviewed.
|
|
3. Members of the review team and the method of review
Group A
|
: The Japan Atomic Power Co., Hitachi Zosen Co.
(Fields of review: Organization/Operation, Education/Training and Handling of major issues (Relationships with cooperating companies and quality assurance) |
Group B |
: Central Research Institute of Electric Power Industry and NSnet
(Fields of review: Design/Manufacturing and Handling of major issues (Excluding relationships with cooperating companies and quality assurance)) |
Method of review |
: site inspection, interview with persons involved and examination of documents in the above areas |
|
4. Summary Report
|
5. Others
Hitachi Administrative Division,Hitachi, Ltd.
Rinkai Factory |
Field observation |
|
|
|
|