Tokyo Site, Fuji Electric Co., Ltd.
Contents Menu
General Affairs Division
Operating Experience Analysys Division
Nuclear Safety Network Division
Codes and Standards Division


Nuclear Safety Network Division
Contents

Message from the manager of the Nuclear Safety Network Division
OverView
Peer Review activities
Safety Caravan sessions
executive seminars and manager seminars

NSnet Peer Review of Tokyo Site, Fuji Electric Co., Ltd., conducted over a three-day period starting November 20th, was completed. A summary of the review is shown below.
We will also summarize opinions and feedback from observers other than those from members and publish the results on the NSnet website concurrently when publishing the report.

[Opinions and impressions of a third-party observer]


1. Reviewed Establishment (location)

Tokyo Site (Nuclear Power & Radiation Systems Division and Tokyo Systems Factory), Fuji Electric Co., Ltd., located in Hino-shi, Tokyo.

2. Overview of the establishment and targets of review

Since it started developing nuclear power in 1956, Fuji Electric Co., Ltd., as a main contractor for Tokai Nuclear Power Station, Japan Atomic Power Co, which is Japan's first nuclear power station, has been designing, manufacturing, and installing major equipment, including the reactor itself, and continued to address decommissioning based on its maintenance experience. In addition, taking advantage of its experience with the Tokai reactor, it has been developing new types of reactors and engaging in the area of nuclear fuel cycle. On the other hand, in the business of radiation detectors and instruments, it has long history that goes back before the world war Ⅱ. Based on its technology, it has been developing radiation monitoring systems since the early stage of nuclear power development. It has delivered such systems to not only all domestic nuclear power stations but also reprocessing and research facilities. Recently, it has developed electronic dosimeters and delivered new personal exposure dose control systems combining dosimeters with computers. Among these operations, Tokyo Site designs and manufactures radiation monitoring systems. As a "knowledge-intensive production base," Tokyo Systems Factory unifies production systems for each division, thereby establishing optimal production systems. Subjected to this review were safety promotion activities in connection with radiation systems of the Nuclear business at Tokyo Site.


3. Members of the review team and the method of review
Group A
: Group A: Chubu Electric Power Co., Mitsubishi Nuclear Fuel Co.
(Fields of review: organization/operation and handling of major issues)
Group B : Group B: Japan Nuclear Cycle Development Institute., NSnet
(Fields of review: education/training and design/manufacturing)
Method of review : site inspection, interview with persons involved and examination of documents in the above areas

4. Others

Ms. Aomi, Advisory Specialist for Consumers' Affairs, participated as an observer.

[Opinions and impressions of a third-party observer]


Tokyo Systems Factory, Fuji Electric Co., Ltd.

Field observation

 